INFORMATION
NEEDED FOR QUOTING AND MANUFACTURING
The following is a list of information that we will need in order to be
successful in our
quoting and manufacturing process for turnkey and consigned jobs. The
preferred
medium is electronic data.
- Contact person (including
phone, fax and/or email) whom we may contact should any questions arise.
- Bill of Material (BOM),
preferably in Excel format, with a description of the components,
manufacturer, manufacturer part number, locations of parts, and quantity
per board for each component. Revision of the BOM should be clearly
identified. For consigned jobs, specify how SMT parts are provided (tape,
bulk, tubes, etc.)
- If this is a turnkey quote,
we need to know your guidelines for substituting components.
- Quantity of boards to be
quoted and time/scheduled period of delivery.
- Assembly drawings for top
and bottom sides of boards, cables, boxes, panels, etc. Revisions of the
drawings should be clearly identified. Preferred file formats are *.dwf,
*.dwg, *.dxf, *.ppt, *.pdf and *.jpg.
- Gerber files for the PCB and
stencil which should include paste layer, silk-screen component layers,
panelization data and CAD data (*.dwf, *.dwg, *.dxf, *.ppt, *.pdf and
*.jpg.).
- Pick and Place files
(centroid data), preferably in Excel format, which should include
reference locator, x and y and theta for every part.
- Schematics diagrams are
necessary when you require electrical test and or an electrical
functionality guarantee.
- Purchase orders must include
BOM number and revision, drawing number and revision, scheduled delivery
dates, quality specifications, pricing, ship to and bill to information,
statutory, regulatory and additional requirements if applicable.
Home | Equipment List | Services | Quoting Info | Directions| ISO/Quality Policy| Contact us